Description:
BMW Certified, GREAT MILES 1,265! Heated Leather Seats, NAV, Onboard Communications System, iPod/MP3 Input, Satellite Radio, Back-Up Camera, Turbo. Alloy Wheels, EXECUTIVE PACKAGE, Premium Sound System. SEE MORE!<br /><br />PURCHASE WITH CONFIDENCE<br />Additional plans are available to extend coverage, if desired, Every vehicle is thoroughly inspected and reconditioned by BMW-Certified technicians, 1-Year/Unlimited Miles plus balance of original new vehicle limited warranty (4-Year/50,000-miles), Roadside Assistance includes jump starts, tire changes, lock out service, and fuel/fluid delivery, 24/7 Roadside Assistance (even if someone else is driving your vehicle), Trip interruption benefits are included, Service vehicle and/or alternate transport are included for the duration of your protection plan <br /><br />OPTION PACKAGES<br />EXECUTIVE PACKAGE Remote Engine Start, Power Tailgate, SensaTec Dashboard, BMW Curved Display w/HUD, Heated Steering Wheel. <br /><br />KEY FEATURES INCLUDE<br />Navigation, Premium Sound System, Back-Up Camera, Satellite Radio, Leather Seats, iPod/MP3 Input, Onboard Communications System, Heated Seats, Turbocharged, Factory Warranty, Dual Zone A/C, Apple CarPlayŽ, Hands-Free Liftgate, Blind Spot Monitor, Cross-Traffic Alert. Rear Air, Steering Wheel Controls, Keyless Entry, Heated Mirrors, Seat Memory. BMW Competition xDrive with Skyscraper Gray Metallic exterior and Kyalami Orange/Black interior features a Straight 6 Cylinder Engine with 543 HP at 6250 RPM*. <br /><br />VISIT US TODAY<br />At BMW of Bayside, we strive to deliver 100% customer satisfaction from the moment you first contact our dealership. Our goal is to provide you with all the information you need to make an informed decision, whether you are purchasing a new BMW or pre-owned car, or servicing the BMW you currently own. We are confident that once you know the facts, you will choose to buy and service your next car from BMW of Bayside. <br /><br />Horsepower calculatio
Date Posted: 06/07/2025
Last Updated: 08/07/2025
Other Recommendations:
2024 BMW M3
$83,900
19,193 mi
Photos:
Contact Seller:
Bmw Of Bayside 24721 Northern Blvd Flushing, NY, 11362